Converter station engineering with proven construction cost savings. PRP worked at both converter stations. Our inputs included the assessment and re-design of existing over designed foundations, saving over £1m in construction costs. Other input was the detailed design of buildings, bunds, roads, drainage, shore protection, fencing and ductwork along with technical support throughout the project.
PRP worked at both converter stations. Our inputs included the assessment and re-design of existing over designed foundations, saving over £1m in construction costs. Other input was the detailed design of buildings, bunds, roads, drainage, shore protection, fencing and ductwork along with technical support throughout the project.
The project delivered measurable value through the assessment and re-design of over designed foundations, saving over £1m in construction costs.
| Project Type | Converter stations |
| Locations | Hunterston and Flintshire Bridge |
| Key Outcome | Over £1m saving in construction costs |
| Design Scope | Buildings, bunds, roads, drainage, shore protection and ductwork |